---
url: /docs/deals-04-troubleshooting-and-faqs.md
---
# Deal Pipeline — Troubleshooting & FAQs

## I accidentally moved a deal to the wrong stage

Just drag it back. There's no confirmation step for stage moves, so
correcting one is as easy as making it — drag the card back to the correct
column.

## Can a deal skip stages?

Yes. You can move a deal directly between any two stages — for example,
from Sourced straight to Closed. The product doesn't enforce a required
order.

## What happens if I delete a deal?

Deleting a deal permanently removes it along with its logged activity and
any linked contacts. You'll be asked to confirm before this happens, and it
can't be undone.

## Does everyone on my team have the same access to Deal Pipeline?

Everyone can view every deal. Adding, editing, and deleting deals needs the
**Create and edit deals** permission, which Admins, Partners, and Analysts
have; Viewers can only look. Deals can't be limited to specific people.
See [Settings — Overview & Concepts](settings-01-overview-and-concepts.md)
for the full roles table.

## "Max can't be below min"

The deal size range is the wrong way round. Put the smaller amount in
**Min** and the larger in **Max**, or leave **Max** empty for a single
amount.

## Someone isn't in the Assigned GP list

The list shows your firm's team members. Invite them under **Settings ›
Team** first. A deal assigned to someone who has since left keeps their name.

## Does editing a deal reset its days in stage?

No. Days in stage counts from when the deal entered its current stage, so
only moving it to a different stage starts the count again.
